| This is an up-to date photo (8/10/07) of the new dojo being built on 2nd Street. As of 06/21/07, we had completed the stem
wall and Trombe Wall
(passive solar collection), and started on the sub-floor.
SIPs panels (The kind with OSB on two sides and insulation
sandwiched in the middle) arrived in the next two weeks and were put
up about a week after that. Update: 11/08/2007 Exterior Stucco is finished and Tom "Can Do Concrete" is pouring the front steps today (Wheelchair ramp will be in back). Toilets are operational, there is heat in the building, the electricians are almost done and the upstairs railing almost complete. The carpet is in, tile 3/4 finished and the wood for the dojo floor is acclimating, it may be started this week. We don't have pictures for a lot of this yet, it's been kinda busy. |
||||||||||
|
||||||||||